Kaiseraugst · June 2026

MOSER GLASER – Pfiffner Group

Industry, Commerce & Residential BuildingsRefurbishmentsLighting Controls
The project

Where high-voltage equipment is built, the daylight sets the pace

A service mandate, DALI-2 and a quick-mounting system – the first stage of a full refurbishment.

Before the first luminaire came the analysis: we surveyed the existing infrastructure in full and brought the needs of the users and of the electrical contractor together with the energy and standards requirements into one solution with clear cost certainty. A service mandate put every thread in our hands and let us prepare the results so that each decision remained comprehensible – including the submission for the funding programme and the support that went with it. What emerged is an installation that runs autonomously: via DALI-2 and the latest Swisslux sensor technology, the Trift continuous-row system follows the daylight and the movement in the hall. A luminaire layout plan and a quick-mounting system kept installation times short, while our on-site support accompanied the electrical contractor step by step. Every component is ready to repair – and this hall is only the beginning: it clears the way for the refurbishment of the entire property.

Core tasks
  1. Definition of the project organisation
  2. Site survey and assessment against the relevant standards
  3. Preparation of the lighting calculation to SN EN 12464, 12193, 13201 and SLG guidelines
  4. Determination of the energy demand to SIA 387/4
  5. Support and briefing of the installers
  6. Delivery of all luminaires and components for implementing the lighting project
This first project paved the way for the refurbishment of the entire property
Services provided
Project managementFunding programmesProduct supply
Facts & figures
Control system
DALI-2
Core products
Trift continuous-row system

Will your project be the next highlight?

Whether industry, sport or public space — we deliver the right lighting solution.

Request a consultation