Home · Who we serve · Owners & operators
04

Owners and operators

Investment security across the entire life cycle.

Those who build or operate think in decades — not in purchase prices. We supply lighting solutions that are still maintainable after 15 years, whose spare parts come from Swiss in-house production, and whose life-cycle costs are on the table openly from the start.

04.1

Life-cycle costs made transparent

A TCO calculation before the investment: purchase, operation, maintenance, energy, disposal. You see in black and white what the installation costs over 15 years — and which variant pays off.

04.2

Refurbishment instead of full replacement

Where it makes sense, we refurbish existing installations with retrofit modules. That saves investment costs, conserves material and uses the value that is already installed.

04.3

We know the funding programs

ProKilowatt, cantonal programs, EnergieSchweiz — we know the current funding landscape and support you with the application. Reduced investment costs thanks to targeted subsidies.

04.4

How we support your project

As the building owner, you decide on budget, schedule and operation. We provide the basis for these decisions, from the first cost estimate to handover. Our page on refurbishments made to measure describes how we renew existing installations.

  1. Goals and framework

    At the start we clarify use, operating hours, budget and schedule with you, and whether it is a refurbishment or a new build. This determines which standards set the framework and whether funding is an option at all.

  2. Variants with cost estimate

    You receive variants with a cost estimate, energy demand to SIA 387/4 and a payback calculation. This lets you decide on a basis that can be checked, not on the lowest unit price.

  3. Tender and award

    On request, we represent your interests in the tender: the requirements document, bill of quantities and technical specifications make the bids comparable. You can see which bids actually deliver the same.

  4. Schedule with funding

    The Swiss Federal Office of Energy (SFOE) assesses ProKilowatt applications in competitive rounds and usually decides two weeks after each round. We plan ordering and installation in the schedule so that nothing is ordered before the funding decision.

  5. Implementation without downtime

    We schedule installation in the time windows your operations allow and, on request, take over site coordination with all trades. Delivery, installation support and commissioning are handled through a single point of contact.

  6. Handover and maintenance

    Handover includes the acceptance report, maintenance plan and digital project documentation that keeps later alterations traceable. On request, a maintenance contract can cover periodic lighting measurements, repairs and warranty extensions.

04.5

Standards that affect you

Anyone operating workplaces must comply with the values of SN EN 12464-1: the SECO guidance on Art. 15 of Ordinance 3 to the Employment Act refers to the standard and treats its values as minimum values. The 2021 edition introduces context modifiers that justify higher illuminance, for example for visual tasks of long duration or little daylight. You decide with us which of them apply, and we record this in the lighting concept. Our article on the current edition of EN 12464-1 gives an overview.

We verify the energy demand of the lighting to SIA 387/4. The verification shows where the installation lies between the limit value and the target value, and it is also the basis for a funding application. If you want light that supports the circadian rhythm, we agree this as a separate goal: EN 12464-1 covers melanopic effects only in an informative annex.

04.6

Funding for your project

The most important question needs to be settled early: refurbishment or new build? ProKilowatt does not fund measures linked to a new building or replacement building, nor measures required by law. For refurbishments, up to 30% of the investment is possible. At KWC Group in Unterkulm, ProKilowatt covered this share, and for the Migros Mülimärt car park in Lenzburg we secured the funding.

Important for your financial planning: the grant is paid out only after the project is completed and the final report has been approved, and if electricity savings fall short of the application, it is generally reduced. Funding from the canton, municipality or utility for energy savings cannot be claimed in addition. Our article sets out the full conditions for a ProKilowatt grant.

04.7

From our projects

KWC Group AG
Unterkulm · June 2022
KWC Group AG

On the KWC Group site, all applications are designed to SN EN 12464, verified to SIA 387/4 and fully documented. In positions with long operating hours, the luminaires are built ready-to-repair, which keeps spare-part management assured in the long term. The payback period is under four years.

Payback
< 4 years
Light point reduction
40 %
Funding
30 % of the investment
Textron Aviation Service Hangars
Kloten · April 2023
Textron Aviation Service Hangars

In the service hangars, full coordination lay with us, from the site survey and lighting calculation to briefing the installers. The energy verifications to SIA 387/4 make operating costs predictable in the long term, and because all luminaires are ready-to-repair, the installation stays in service throughout its life cycle. Installation took two weeks.

Payback
< 5 years
Installation time
2 weeks
Verifications
Energy verification to SIA 387/4
04.8

Your contact

For clients, owners and operators, Beat Hohler is the direct point of contact, from the first site visit and the economic viability calculation to handover. You receive figures that can be checked and a clear answer on whether a funding application is worthwhile for your project.