Hägendorf · December 2023

SBB Rail Technology Center

Industry, Commerce & Residential BuildingsRefurbishments
The project

Where Switzerland maintains its railway — new light for 8'370 m² of workshop hall

A refurbishment without any intervention in the existing installation: 432 light-line inserts, integrated into the existing DALI control, installed within the given time window.

At the SBB Rail Technology Center in Hägendorf we renewed the lighting of the entire hall without touching the existing infrastructure — the 432 new light-line inserts slot into the existing DALI control as if they had always been there. The lighting design to SN EN 12464 and the energy verification to SIA 387/4 were calculated in our own house, the luminaires then assembled exactly as the electrical contractor needed them, with a project-specific parts list enclosed for every axis. Delivered pre-palletised and in project packaging, the whole hall stood in new light within the given time window — with little packaging waste and no searching on site. Because we sized quantity and output consistently to the actual demand, the energy demand falls by 130 MWh, with 21 % fewer light points. And because every light-line insert stays repairable and can be freed of dust without effort, the installation remains serviceable across its entire service life.

Core tasks
  1. Site survey and assessment against the relevant standards
  2. Preparation of the relevant product verifications
  3. Photo and product documentation
  4. Processing and preparation of digital planning documents
  5. Calculation of power and energy limit values
  6. Preparation of the lighting calculation to SN EN 12464, 12193, 13201 and SLG guidelines
  7. Preparation of project-specific parts lists for installation
  8. Determination of the energy demand to SIA 387/4
  9. Support and briefing of the installers
  10. Delivery of all luminaires and components for implementing the lighting project
  11. Joint project closure at final handover
Services provided
Lighting designBuilding refurbishmentProduct supply
Facts & figures
Area
8'370 m²
Number of luminaires
432
Energy saved
130 MWh
Light point reduction
21 %
Control system
DALI
Project duration
12 months
Installation time
3 weeks
Core products
Aletsch light-line insert