Hägendorf · December 2023

SBB Rail Technology Center

Industry, Commerce & Residential BuildingsRefurbishments
The project

New light for the SBB's 8'370 m² workshop hall

A refurbishment without any intervention in the existing installation. The 432 light-line inserts run on the existing DALI control and were installed in three weeks.

At the SBB Rail Technology Center in Hägendorf we renewed the lighting of the entire hall without touching the existing infrastructure. The 432 new light-line inserts are integrated into the existing DALI control. The lighting design to SN EN 12464 and the energy verification to SIA 387/4 were both done in house. We then assembled the luminaires exactly as the electrical contractor needed them and enclosed a separate parts list for every axis. Everything arrived pre-palletised in project packaging. That kept packaging waste low, and nobody on site had to search for material. The whole hall was converted within the given time window. We sized quantity and output to the actual demand: the hall now manages with 21 % fewer light points, and energy demand falls by 130 MWh. Every light-line insert can be repaired and easily cleaned of dust, so the installation stays maintainable over its entire lifetime.

Core tasks
  1. Site survey and assessment against the relevant standards
  2. Preparation of the relevant product verifications
  3. Photo and product documentation
  4. Processing and preparation of digital planning documents
  5. Calculation of power and energy limit values
  6. Preparation of the lighting calculation to SN EN 12464, 12193, 13201 and SLG guidelines
  7. Preparation of project-specific parts lists for installation
  8. Determination of the energy demand to SIA 387/4
  9. Support and briefing of the installers
  10. Delivery of all luminaires and components for implementing the lighting project
  11. Joint project closure at final handover
Services provided
Lighting designBuilding refurbishmentProduct supply
Facts & figures
Area
8'370 m²
Number of luminaires
432
Energy saved
130 MWh
Light point reduction
21 %
Control system
DALI
Project duration
12 months
Installation time
3 weeks
Core products
Aletsch light-line insert